Built in 1820, St Patrick’s Oram required a specialised surface preparation contractor to help them renovate and upgrade the chapel’s historic walls.
16
12 '16
As Ireland’s only remaining mainline steam engineering depot, the Railway Preservation Society for Ireland engaged with AFS
13
12 '16
Following a successful live plant rooms floor upgrade, AFS cooked up further success for Seagate with the rapid upgrade of their kitchen floors at their Springtown facility.
06
12 '16
Global hard drive manufacturer, Seagate required a flooring contractor who could replace a failed coating system in their live plant production rooms at the Springtown facility